MV Alfa Lift
In 2021 OHT will bring to market the largest and most innovative, custom-built offshore wind foundation installation vessel in the World. Alfa Lift will feature a 3,000 t main crane, a 10,000+ m² ‘smart deck, capable of carrying and installing up to 16 XL monopiles or 10 jackets per voyage, and will be able to fully submerge the main deck to a depth of 14.66 m.