Wind foundation structures

OHT Albatross successfully transported five wind foundation structures from Spain to Norway in May 2017. The vessel loaded the units by roll-on method and discharged by float-off. Due to the size of each foundation, with length of 91 m and weight 3,600 mt, the transport were completed by three voyages.

Link to fleet Contact us
Contact form